If you have finished the form mapping recording and reviewed it, you can use this to initialize the related message mapping.
| 1. | Click Connectivity studio Integration Design. |
| 2. | On the Message tab, in the list, find and select the desired message. |
| 3. | Click Edit. |
| 4. | On the ActionPane, on the Design tab, in the Message mapping group, click Initialize from form mapping. |
| 5. | Close the page. |
| Related to | Notes |
|---|---|
|
Use form mapping |
  |