--- title: "Set up BOM lot preferences" slug: "bc-set-up-bom-lot-preferences" description: "Set up BOM lot preferences for production components to ensure compliance with defined specifications and enhance production efficiency." tags: ["BC", "Business Central", "Food", "Task"] updated: 2026-06-25T09:59:14Z published: 2026-06-25T09:59:14Z canonical: "docs.staedean.com/bc-set-up-bom-lot-preferences" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up BOM lot preferences You can define BOM lot preferences for production components. When an item lot is entered on a consumption journal line for a production order, the program alerts you if the entered lot does not meet the defined lot preferences. The following steps describe how to set up BOM lot preferences for a package BOM. The same procedure applies to formulas, item processes, and co-product/by-product processes. For simplicity, only a package BOM is described in detail. ## Steps 1. In the search box, enter **Package BOMs**, and then choose the related link. 2. Select the package BOM that you want to assign one or more lot preferences to. 3. On the **Versions** FastTab, select the package BOM version that will have lot preferences, choose **Actions**, and then choose **Edit Version**. The **Package BOM Version** page appears. The **Lines** FastTab displays the package BOM's components. Lot preferences are defined for specific components. 4. Select the component that will have lot preferences, choose **Actions**, and then choose **Lot Preferences**. The **BOM Line Lot Preferences** page appears. The **BOM Line Lot Preferences** page contains two tables. Define lot age preferences in the top table and lot specification preferences in the bottom table. All lot preferences entered on this page apply to the selected BOM component. 5. Fill in the remaining fields. ## Related - [Lot specifications](/bc-lot-specifications.md)