--- title: "Release 28.4.127779.0 (August 2026)" slug: "bc-release-28-4-127779-0-august-2026-iem" description: "Explore Release 28.1.125226.0 for Industrial Equipment Manufacturing in Microsoft Dynamics 365 Business Central, featuring essential bug fixes." updated: 2026-09-16T10:30:00Z published: 2026-09-16T10:30:00Z canonical: "docs.staedean.com/bc-release-28-4-127779-0-august-2026-iem" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Release 28.4.127779.0 (August 2026) Find information on Release 28.4.127779.0 (August 2026) of Industrial Equipment Manufacturing for Microsoft Dynamics 365 Business Central. Version information: | **Product** | **Version** | **Minimal version** | **Platform** | | --- | --- | --- | --- | | **Industrial Equipment Manufacturing** | **28.4.127779.0** | **27.0.127779.0** | **Cloud** | ## Bug fixes Bug fixes in Release 28.4.127779.0 (August 2026) - Industrial Equipment Manufacturing. | Bug ID | Title | Description | | --- | --- | --- | | 241279 (CS00240024) | Cross-dock container cannot handle multiple lines | The cross-dock container could not process more than one line, which blocked cross-docking when several lines were involved. | | 241824 (CS00240066) | Quote Required validation on Sales Cycle Stage does not recognize linked Project | The Quote Required validation on the sales cycle stage did not recognize a linked project, so the check was applied incorrectly. | | 242623 (CS00240139) | IEM Job Assembly Component (Table 11014535): Unit Cost and Cost Amount not populated | The Unit Cost and Cost Amount fields on the IEM Job Assembly Component table stayed blank, so assembly component costs were missing. | | 243015 (CS00240163) | Time entry posting for assembly order not completed when the assembly order is posted | Time entry posting did not complete when an assembly order was posted, so the related time entries stayed open. | | 243266 (CS00240183) | Job Planning Line (Table 1003) - Unit Cost (Field 1002) not populated from purchase | The Unit Cost on the job planning line was not populated from the related purchase document, so planning costs were missing. | | 244267 (CS00240219) | Copy project does not work | The copy project function did not work, which prevented users from creating a project from an existing one. | | 244619 (CS00240281) | Work Center Capacity Double-Booked When Resource Is Linked to Routing Operation | Work center capacity was double-booked when a resource was linked to a routing operation, which overstated the load. | | 245123 (CS00240303) | Resource Planning - Date format error when navigating columns | A date format error occurred when navigating columns on the Resource Planning page. | | 245155 (CS00240311) | Warranty Starting Date not populated on Service Items after Delivery | The warranty starting date was not populated on service items after delivery, so warranty periods were not tracked. | | 247284 (CS00240638) | Quantity Per on Job Planning Line is overwritten by calculated Quantity | The Quantity Per value on the job planning line was overwritten by the calculated quantity, so the entered value was lost. | | 248673 (CS00240787) | No. of Days cleared on project task lines when Scheduling Direction is changed | The No. of Days value on project task lines was cleared when the scheduling direction was changed. | | 248674 (CS00240788) | Initialize Task Dates clears No. of Days on all task lines | Running Initialize Task Dates cleared the No. of Days value on all task lines. | | 249473 (CS00240830) | POC WIP calculation fails to recognize sales | The percentage of completion WIP calculation did not recognize sales, which produced incorrect WIP values. | | 249768 (CS00240868) | Project completion checks not triggered when Complete field set to Yes | Project completion checks were not triggered when the Complete field was set to Yes. | | 249792 (CS00240840) | Project Completion checks not enforced as documented when Action if Error = Error | Project completion checks were not enforced as documented when Action if Error was set to Error. | | 249843 (CS00240857) | Project Planning Line turns bold/black upon creating a Purchase Quote | Project planning lines turned bold and black after a purchase quote was created, which misrepresented the line status. | | 250620 (CS00240940) | Work type not copied when creating new Budget from existing Budget | The work type was not copied when a new budget was created from an existing budget. | | 270815 (CS00241035) | Purchase quote does not take over location code | The purchase quote did not take over the location code from the job planning line, so the ship-to location stayed empty. | ## Related - [Release 28.1.125226.0 (June 2026)](/bc-release-28-1-125226-0-june-2026-iem.md) - [Release 28.0.124026.0 (April 2026)](/bc-release-28-0-124026-0-april-2026-iem.md)