Find information on Release 28.1.125226.0 (June 2026) of Industrial Equipment Manufacturing for Microsoft Dynamics 365 for Microsoft Dynamics 365 Business Central.
Version information:
Product | Version | Minimal version | Platform |
|---|---|---|---|
Industrial Equipment Manufacturing | 28.1.125226.0 | 27.0.125226.0 | Cloud |
Bug fixes
Bug fixes in Release 28.1.125226.0 (June 2026) - Industrial Equipment Manufacturing.
Bug ID | Title | Description |
|---|---|---|
243008 (CS00240162) | When a project quote is created from an opportunity the tasks are not editable | Project quote tasks become non-editable when the quote is created from an opportunity tied to a contact without a Bill-to Customer No., because the job task editability validation blocks the scenario. |
244325 (CS00240222) | Quantity field blocked on Project Planning Line for items with Reserve = Always | Project planning lines using items with |
241827 (CS00240082) | Budget Line Element Not Updated When Copying Budget Line to a Different Project | Copying a budget line to another project task keeps the source element instead of updating the copied line to the destination task's element. |
244328 (CS00240258) | Resource Group Added to Budget Line Counted Double in Res. Group Availability | Resource group quantities entered on budget lines are counted in both budget allocation and planning allocation before planning lines exist, which understates net availability. |
241825 (CS00240067) | Project Summary - Material Costs (Budget) excludes Item Category budget lines | The material cost total on Project Summary omits |
241826 (CS00240071) | Expand Assembly BOM quantities not working correct | After expanding an assembly BOM, changing the parent quantity does not correctly recalculate component quantities and reset the parent line as intended. |
243796 (CS00240217) | Re-use planning lines is not working correctly | The reuse planning line flow only allows one linked planning line and does not expose the expected reuse indication on production order component lines. |
238986 (CS00239764) | The work type code is not copied from template budget line to project budget line | Work type codes defined in project task template budget lines are not transferred to created project budget lines, which also affects price lookup. |
238987 (CS00239765) | When deleting a work type from a Project Task template an unrelated error is there | Removing a work type code from a project task template budget line throws an unrelated resource error instead of cleanly clearing the value. |
240857 (CS00239957) | Create Job Matrix action on the Estimate page creates errors | Creating the job matrix processes tasks in an undesirable order and can fail with duplicate project task or project task dimension errors. |
239218 (CS00239782) | Budget comment is not allowing to add comments | The budget comment action opens a non-editable comment page, so users cannot add or maintain comments from project budget lines. |
238970 (CS00239771) | A surcharge model on a project creates an error when resources are posted | Posting resource time with a surcharge model on the project fails with a missing Project Register error during surcharge posting. |
230047 | Post Costs When Re-use Production is Finished (Critical) | Cost posting for reuse production is not handled correctly when the production order is finished, based on the confirmed backlog item title. |
227144 | Expand assembly bom quantity not updated | Expanded assembly BOM parent quantity changes do not properly drive child quantity recalculation and reset behavior on the exploded lines. |
240959 | Project Task Matrix does not respect Step Size when creating task lines - Delaware | Project Task Matrix creates task numbers sequentially instead of incrementing them by the configured step size. |