Release 28.1.125226.0 (June 2026)

Prev Next

Find information on Release 28.1.125226.0 (June 2026) of Industrial Equipment Manufacturing for Microsoft Dynamics 365 for Microsoft Dynamics 365 Business Central.

Version information:

Product

Version

Minimal version

Platform

Industrial Equipment Manufacturing

28.1.125226.0

27.0.125226.0

Cloud

Bug fixes

Bug fixes in Release 28.1.125226.0 (June 2026) - Industrial Equipment Manufacturing.

Bug ID

Title

Description

243008 (CS00240162)

When a project quote is created from an opportunity the tasks are not editable

Project quote tasks become non-editable when the quote is created from an opportunity tied to a contact without a Bill-to Customer No., because the job task editability validation blocks the scenario.

244325 (CS00240222)

Quantity field blocked on Project Planning Line for items with Reserve = Always

Project planning lines using items with Reserve = Always prevent users from changing the quantity, which blocks normal planning updates.

241827 (CS00240082)

Budget Line Element Not Updated When Copying Budget Line to a Different Project

Copying a budget line to another project task keeps the source element instead of updating the copied line to the destination task's element.

244328 (CS00240258)

Resource Group Added to Budget Line Counted Double in Res. Group Availability

Resource group quantities entered on budget lines are counted in both budget allocation and planning allocation before planning lines exist, which understates net availability.

241825 (CS00240067)

Project Summary - Material Costs (Budget) excludes Item Category budget lines

The material cost total on Project Summary omits Item Category budget lines, so budgeted material costs are shown lower than expected.

241826 (CS00240071)

Expand Assembly BOM quantities not working correct

After expanding an assembly BOM, changing the parent quantity does not correctly recalculate component quantities and reset the parent line as intended.

243796 (CS00240217)

Re-use planning lines is not working correctly

The reuse planning line flow only allows one linked planning line and does not expose the expected reuse indication on production order component lines.

238986 (CS00239764)

The work type code is not copied from template budget line to project budget line

Work type codes defined in project task template budget lines are not transferred to created project budget lines, which also affects price lookup.

238987 (CS00239765)

When deleting a work type from a Project Task template an unrelated error is there

Removing a work type code from a project task template budget line throws an unrelated resource error instead of cleanly clearing the value.

240857 (CS00239957)

Create Job Matrix action on the Estimate page creates errors

Creating the job matrix processes tasks in an undesirable order and can fail with duplicate project task or project task dimension errors.

239218 (CS00239782)

Budget comment is not allowing to add comments

The budget comment action opens a non-editable comment page, so users cannot add or maintain comments from project budget lines.

238970 (CS00239771)

A surcharge model on a project creates an error when resources are posted

Posting resource time with a surcharge model on the project fails with a missing Project Register error during surcharge posting.

230047

Post Costs When Re-use Production is Finished (Critical)

Cost posting for reuse production is not handled correctly when the production order is finished, based on the confirmed backlog item title.

227144

Expand assembly bom quantity not updated

Expanded assembly BOM parent quantity changes do not properly drive child quantity recalculation and reset behavior on the exploded lines.

240959

Project Task Matrix does not respect Step Size when creating task lines - Delaware

Project Task Matrix creates task numbers sequentially instead of incrementing them by the configured step size.