--- title: "Project WIP, expected WIP, committed WIP" slug: "bc-project-wip-expected-wip-committed-wip" updated: 2026-06-25T07:58:46Z published: 2026-06-25T09:59:17Z canonical: "docs.staedean.com/bc-project-wip-expected-wip-committed-wip" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Project WIP, expected WIP, committed WIP Project Control Suite makes it possible to track inventory pegged for a project. This functionality is based on the [Control supply from project](/business-central/docs/bc-control-supply-from-project) setting. Based on the reservation, project WIP can be made visible at three levels: - **Project WIP**, actually consumed in the project (project ledger entries). - **Expected WIP**, received in inventory, reserved for the project, but not consumed or delivered. - **Committed WIP**, remaining quantity on supply orders reserved for the project but not received. The above can be made visible in a report: **Project WIP and Expected WIP** (reports from the **Industrial Equipment Manufacturing - Project Manager** role center). A query (IEMProjects.Query.al) is also provided that pulls together a dataset on which a Power BI report can be created: ![Project WIP, Expected and Committed](https://cdn.document360.io/da662430-6a41-47b1-8c7e-7e4ac37a9756/Images/Documentation/JobWIPPowerBI.png)*Example report* ## Related - [Control supply from project](/bc-control-supply-from-project.md) - [Design details](/bc-design-details-pcs.md) - [Project Control Suite](/bc-project-control-suite.md)