--- title: "Project features" slug: "bc-project-features" description: "Set user-definable project features in the Project Control Suite, customize sequences, and manage values for efficient project planning and tracking." updated: 2026-06-25T09:59:11Z published: 2026-06-25T09:59:11Z canonical: "docs.staedean.com/bc-project-features" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Project features Project features are user-definable fields for a project. Per company, 20 features can be defined in the Project Control Suite Setup by selecting them from the ProjectFeatures list. The setup also determines the sequence in which the ProjectFeatures are used. Per project, select the value of a feature from a predefined list or enter free text. Set ProjectFeatures from the ProjectHeader, the ProjectBudget line, and the ProjectPlanning line. The ProjectFeature values are stored as a ProjectFeature Set ID and copied along in the various transactions. > [!NOTE] > Note > > - The ProjectInformation fact box shows the number of features and the number for which a value is selected, for example, 2/5 means that two of five features are specified. > - The ProjectFeatures from the ProjectItem Planning line are also available from the purchase order line: Project Planning Line in the purchase order line menu. ## Maintain features Set project features in two steps. ### Steps - Set up features Define the features in the features list and specify the content for each feature. 1. Choose the ![Lightbulb that opens the Tell Me feature](https://cdn.document360.io/da662430-6a41-47b1-8c7e-7e4ac37a9756/Images/Documentation/search_small(3).png) icon (Alt+Q) and type **Features**. 2. Fill in the fields: | Field | Description | | --- | --- | | Code | Identifies the feature. | | Description | Describes the feature. | | Type Code | **Predefined List**: feature values are copied from another table to create a list you can select from in the project. **Option List**: feature values are typed in a list you can select from in the project. **Free Text**: type your own feature value in the project. | | Table No. | For a predefined list, select the table number from which the feature values are copied. | | Table Name | Populated when a table number is selected. | | Field No. | For a predefined list, select the field number from the specified table from which the feature values are copied. | | Field Name | Populated when a field number is selected. | ### Steps - Define features and sequence on Project Control Suite Setup Set the features to use and their sequence in the Project Control Suite Setup, **Features** fast tab. 1. Type **Projects Setup** in the search box. 2. Select **Projects Setup**. 3. Open the **Project Features** fast tab. 4. In the **Feature Code** fields, select a feature to use in projects. ## Related - [Setting up Project Control Suite](/bc-setting-up-project-control-suite.md)