--- title: "Assign routing information to equipment" slug: "bc-assign-routing-information-to-equipment" tags: ["BC", "Business Central", "Food", "Task"] updated: 2026-06-25T09:59:13Z published: 2026-06-25T09:59:13Z canonical: "docs.staedean.com/bc-assign-routing-information-to-equipment" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Assign routing information to equipment If routings are used in production, link them to the pieces of equipment assigned to a production BOM. When a production order is scheduled to a piece of equipment, the program assigns the routing linked to that piece of equipment to the production order. The following steps describe how to assign routing information to a package BOM's assigned equipment. The same procedure applies to formulas, item processes, and co-product/by-product processes. For simplicity, only a package BOM is described in detail. ## Steps 1. In the search box, enter **Package BOMs**, and then choose the related link. 2. Open the relevant package BOM card. On the **Versions** FastTab, select the package BOM version that will have routings and choose **Edit Version**. The **Package BOM Version** page appears. 3. On the **Equipment** FastTab, select the line for the piece of equipment you want to link to a routing. 4. In the **Routing No.** field, enter the routing you want to link to the piece of equipment. ## Related - [Set up equipment](/bc-set-up-equipment.md) - [Set up general basic process manufacturing rules and values](/bc-set-up-general-basic-process-manufacturing-rules-and-values.md)